As the COVID-19 pandemic rages through the world, a “tsunami” of legal and economic issues including breach of contracts occurred in the private and public sectors. In Iran and throughout the world, almost all contracts contain so-called “force majeure” clauses, which excuse a business’s non-performance if circumstances beyond their control prevent (or sometimes hinder) performance. These clauses often list out the circumstances which excuse non-performance and they may include flood, fire, terrorism, war “Act of God” and sometimes epidemic. Due to the impacts of the pandemic on the price of materials and tremendous increase in the costs, contractors try to take COVID-19 as a legal excuse (force majeure) to breach the contract. The present paper tries to answer the questions that can the contractors take force majeure as a “get out of jail free” card? Does the COVID-19 outbreak constitute force majeure and excuse non-performance of contract? And how does it affect “time of Essence” clauses in contracts? Through the critical analysis method, this article scrutinizes the legal challenges of the issue.  Findings show that having a look ahead, the legislator has to redefine the meaning of force majeure in the Iranian and European law.

کلیدواژه‌ها


عنوان مقاله [English]

Legal Issues Tsunami in the Wake of COVID -19 and Contractual Breach

نویسندگان [English]

  • Parviz Bagheri 1
  • Nabeel Mahdi Althabhawi 2
  • Pardis Moslemzadeh 3
1 Assoc. Prof of Law Dep. Ilam University
2 Faculty of Law, University Kebangsaan Malaysia
3 Faculty of Law , University of Malaya
چکیده [English]

As the COVID-19 pandemic rages through the world, a “tsunami” of legal and economic issues including breach of contracts occurred in the private and public sectors. In Iran and throughout the world, almost all contracts contain so-called “force majeure” clauses, which excuse a business’s non-performance if circumstances beyond their control prevent (or sometimes hinder) performance. These clauses often list out the circumstances which excuse non-performance and they may include flood, fire, terrorism, war “Act of God” and sometimes epidemic. Due to the impacts of the pandemic on the price of materials and tremendous increase in the costs, contractors try to take COVID-19 as a legal excuse (force majeure) to breach the contract. The present paper tries to answer the questions that can the contractors take force majeure as a “get out of jail free” card? Does the COVID-19 outbreak constitute force majeure and excuse non-performance of contract? And how does it affect “time of Essence” clauses in contracts? Through the critical analysis method, this article scrutinizes the legal challenges of the issue.  Findings show that having a look ahead, the legislator has to redefine the meaning of force majeure in the Iranian and European law.

کلیدواژه‌ها [English]

  • COVID-19
  • Breach of Contract
  • Force Majeure
  1. Aderinboye, A (2020). The Legal Effect of Corona Virus Epidemic on the Doctrine of Force Majeure in Commercial Contracts; The Lagos-Ibadan Rail Project Example.
  2. Andrew, B (2016). A Restatement of the English law of Contract, Oxfotd University Press.
  3. Berger, K. P; Behn, D (2020). “Force Majeure and Hardship in the Age of Corona: A Historical and Comparative Study”, McGill Journal of Dispute Resolution, (2019/2020) Number 4.
  4. Cheshire, F; Furmston. (2012). Law of Contract, 16th ed, Oxfotd university Press. .
  5. Chung, G (2020). “A Comparative Analysis of the Frustration Rule: Possibility of Reconciliation between Hong Kong English ‘Hands-Off Approach’ and German ‘Interventionist Mechanism”. 25 European Review of Private Law, Issue 1.
  6. Crespi, G.S. (2020). “Frustration of Purpose as an Excuse for the Non-Performance of Contractual Obligations Impacted by the Coronavirus COVID-19 Pandemic and by Pandemic-Related Governmental Restrictions: Some Preliminary Thoughts”. SMU Dedman School of Law Legal Studies Research Paper No. 471.
  7. Darabpour, M. (2012), Legal challenges in the International commercial dealings, Tehran, Khorsandi.
  8. Darabpour, M; Adib, A. (2020). the impact of unpredictability on the execution of the commercial contracts, Tehran, shahid beheshti, legal studies.
  9. Donald. J. S (2003). Bounded Rationality, The Doctorin of Impractibility and the Governance of Relational Contracts, Southern California Interdisciplinary Law Journal, Vol.13, No.2.

10. Fathi, A. (2020). The analysis of the corona virus impacts on the contracts, law and jurisprudence conference, Tehran, https://civilica.com/doc/1118629

11. Ghanavati, J (2020). the comparative study of the covid-19 impacts on the contracts, Islamic law journal, 17., No.64.

12. Gore, K. N; Camp, Ch (2020). “The Coronavirus: Business Risks, Liabilities, and Force Majeure in the Face of a Global Health Crisis”, The World Financial Review March/April 2020.

13. Grady, M. F (2013). “Causation and Foreseeability, Research Handbook on the Economic Analysis of Torts”, Jennifer H. Arlen, ed., Edward Elgar Publishing, 2013; UCLA School of Law, Law Econ Research Paper No. 13-03.

14. Gritsenko, M (2014). Sanctions Force Majeure and Frustration OfContracts under English Law, Moscow, Bryne Cave, October.

15. Mazzacano, P. J. (2012). “Force Majeure, Impossibility, Frustration & the Like: Excuses for non-Performance; the Historical Origins and Development of an Autonomous Commercial Norm in the CISG”. Nordic Journal of Commercial Law, No. 2.

16. Mohaghegh D., S. M, (2019). the general theory of the rejection of difficulty in the islamic law, Tehran, sokhan publication.rciale_8_01_2014.pdf

17. Poole, J. (2006). Textbook on Contract Law, 8th ed, Oxford: University Press.

18. Roberts, M (2014). “Frustration in New Zealand's Supreme Court: A Return of Failure of Consideration?”. LMCLQ 305.

19. Safaee, S. H (2010). legal articles: Force Majeure, Tehran, Mizan publication.

20. Treitel G.H (2015). The Law of Contract, 14th Ed, Sweet and Maxwell.

21. www.bag.admin.ch/dam/bag/de/dokumente/mt/epidemiengesetz/faq-epg.pdf. download.pdf/Fragen%20und%20Antworten_d.pdf.

22. www.ch.ch/de/uberstunden-und-uberzeit/

23. www.tradefinance.training/blog/articles/force-majeure-consistency-between-icc-rules/ 2021/08/02. 

24. www.chinadaily.com.cn/a/202002/17/WS5e4a38eaa31012821727818d.html. 

25. www.leclubdesjuristes.com/wpcontent/uploads/2020/03/cour_appel_besancon_2e_chambre_comme.

26. www.leclubdesjuristes.com/wpcontent/uploads/2020/03/cour_appel_nancy_1re_chambre_civile_22_11_2010.pdf

27. www.leclubdesjuristes.com/wpcontent/uploads/2020/03/cour_appel_PARIS_Chambre_25_section_B_25_09_1998.pdf.

28. www.legifrance.gouv.fr/affichCodeArticle.do?idArticle=LEGIARTI000032041431&cidTexte=LEGITEXT000006070721&dateTexte=20161001.

29. www.seco.admin.ch/seco/de/home/Arbeit/Personenfreizugigkeit_Arbeitsbeziehungen/Arbeitsrecht/FAQ_zum_privaten_Arbeitsrecht/ueberstunden.html.

30. www.seco.admin.ch/seco/de/home/Arbeit/Personenfreizugigkeit_Arbeitsbeziehungen/Arbeitsrecht/FAQ_zum_privaten_Arbeitsrecht/verhinderung-des-arbe itnehmers-an-der-arbeitsleistung.html.

31. Zivkovic, V (2012). Hardship in French, English and German Law, SSRN-id 585883. 1.